1. INTRODUCTION
This is the Unitary Development Plan (UDP), for Warrington
which became a unitary authority on 1st April 1998. It is the
first single comprehensive statutory development plan for the
borough. It has been prepared under the provisions of the Town
and Country Planning Act 1990 (as amended by the Planning and
Compensation Act 1991). Section 54a of the 1990 Act requires
development control decisions to be determined in accordance
with the development plan unless material considerations indicate
otherwise. The final stages of preparation have been completed
under the transitional arrangements of the Planning and Compulsory
Purchase Act 2004. The adopted Plan is ‘saved’ as
part of the Council’s Local Development Framework under
the 2004 Act, and Section 38(6) perpetuates the requirement
of previous Section 54a.
The UDP contains policies and proposals for:
- the development and use of land;
- conservation of natural beauty and the amenity of land;
- improvement of the physical environment; and
- the management of traffic
In drawing up its policies and proposals, the Council has had
regard to:
- sustainable development objectives;
- national planning policy guidance;
- regional planing policy guidance;
- the level of resources likely to be available; and
- social, economic and environmental considerations.
The UDP also takes account of other plans and strategies of
the Council, including the Corporate Plan (previously the Best
Value Performance Plan), and will help to deliver wider corporate
objectives insofar as they relate to the use and development
of land.
When adopted, the UDP will replace all other development plans
currently operative in the borough including:
- the Cheshire 2001 Replacement Structure Plan;
- the Cheshire Minerals and Waste Disposal Local Plans; and
- a number of part-area Local Plans approved in the early
1980s and Town Maps dating back to the late 1950s.
2. UDP FORMAT AND CONTENT
The UDP is in two parts. Part 1 comprises a written statement
of general policies and proposals of strategic importance for
the use and development of land. These provide the framework
for the more detailed policies and specific proposals that follow
in Part 2. Part 2 comprises a written statement of policies
and proposals and a Proposals Map showing the site-specific
proposals and area-based policies on an Ordnance Survey map
base. Because the future pattern of development within Warrington
is largely predetermined by existing commitments these are shown
on the Proposals Map. They are, however, shown for information
purposes only and are not open to objection through the UDP
process.
Part 2 of the plan is divided into a number of chapters dealing
with the following specific topics:
TRANSPORT INTEGRATION
HOUSING
TOWN CENTRES AND RETAIL DEVELOPMENT
ECONOMIC DEVELOPMENT
ENVIRONMENTAL PROTECTION AND ENHANCEMENT
BUILT HERITAGE
RESOURCE CONSERVATION
MINERALS AND WASTE
MISCELLANEOUS DEVELOPMENT CONTROL
Part 2 of the plan also contains the reasoned justifications
for the strategic policies in Part 1.
All policies and proposals are set out in bold text. The policies
are each followed by supporting text, which sets out:
- the derivation or ‘origin’ of the policy by
reference to relevant national or regional planning guidance;
- the reason for having the policy and an explanation of
its intended purpose; and
- its relationship to other UDP policies.
3. STATUS OF THE PLAN
The Town and Country Planning (Development Plan) (England)
Regulations 1999 introduced changes to the procedures for preparing
UDPs. Publication of the Revised Deposit Draft UDP for formal
public consultation with local residents, businesses, interest
groups and other interested parties marked the second formal
stage in a two-stage deposit procedure.
The First Draft UDP was placed on deposit for formal public
consultation from 21st June to 2nd August 2001. The plan attracted
over 11,300 formal representations comprising 9,853 objections
and 1,462 expressions of support. The Revised Deposit Draft
UDP was placed on deposit from 4th November to 16th December
2002 which gave rise to a further 3,295 objections and 9,355
supporting representations. A number of Pre Inquiry Changes
were published for consultation between 3rd November and 15th
December 2003, resulting in a further 53 representations, 36
of which were objections. A public Inquiry into the Revised
Deposit UDP and Pre Inquiry Changes was held between January
6th and November 16th, 2004. The Inquiry sat for 37 days. The
Inspector reported his findings and made recommendations in
his report published in April 2005. The Council’s response
to his recommendations and the resulting modifications were
published in late summer 2005. Further modifications were published
November-December 2005 in response to objections. The final
version of the plan is the outcome of completion of the full
statutory preparation process and was formally adopted by the
Council, and became operative, on 23 January 2006.
4. GEOGRAPHICAL CONTEXT OF THE BOROUGH OF
WARRINGTON
On 1st April 1998 Warrington became one of two new ‘unitary’
authorities in Cheshire. As a result, Warrington Borough Council
assumed responsibility for all planning matters within its area,
including minerals, waste and other matters of a strategic nature
previously carried out by Cheshire County Council under the
‘two-tier’ planning system.
Warrington is the most northerly of the eight local authorities
in Cheshire. It shares boundaries with Halton, which also gained
unitary status in 1998, the four metropolitan boroughs of St
Helens, Wigan, Salford and Trafford and the Cheshire districts
of Vale Royal and Macclesfield (where the County Council is
still the strategic planning authority).
The borough of Warrington covers some 176 square kilometres
and, at mid- 2000, had a population of 190,800 living in some
80,000 households. The town of Warrington is by far the largest
settlement in the borough, having a population of over 160,000
and providing jobs for some 80,000 people. This, in part, reflects
over 20 years of planned growth following its designation as
a new town in 1968. The Warrington New Town Outline Plan, approved
in 1973, set out a strategy to expand the town’s population
from about 120,000 to 200,000 by the year 2000. Whilst the planned
rate of growth has not been achieved and some of the supporting
transport infrastructure is not in place, the growth that has
taken place has markedly changed the status, profile and character
of the town.
Since the end of the new town era, strategic planning policies
in the Cheshire Structure Plan have sought to slow down overall
rates of growth in Warrington. The UDP strategy seeks to continue
this trend within the overall context provided by Regional Planning
Guidance (now the Regional Spatial Strategy, or ‘RSS’)
for the North West (see below). The UDP seeks to concentrate
new development within the town of Warrington by maximising
the amount of new development on previously developed land.
It also seeks to direct growth in retail, leisure and commercial
activity towards Warrington town centre, which is the principal
focus of the borough’s public transport network. In accordance
with government policy, the UDP seeks to maintain the viability
and vitality of the town centre as the primary location for
uses that attract large numbers of journeys such as retail and
leisure.
During the new town era, planning policies of restraint were
successfully applied to the villages and rural areas of the
borough. The largest of the borough’s outlying settlements
are Lymm, Culcheth and Burtonwood. These play largely ‘dormitory’
roles but also provide a range of services to their surrounding
areas. These, along with the smaller settlements of Appleton
Thorn, Croft, Glazebury, Hollins Green, Oughtrington and Winwick,
are treated as green belt inset villages in the UDP. Opportunities
for development on previously developed land will continue to
arise in these villages.
At the next level in the hierarchy, there are a number of small
settlements set in open countryside and ‘washed over’
by green belt. These vary greatly in character and include Broomedge,
Collins Green, Cuerdley Cross, Glazebrook, Grappenhall, Hatton,
Heatley/Heatley Heath, Higher Walton, Mee Brow/Fowley Common,
Stretton, Thelwall, Weaste Lane and New Lane End. Some, such
as Grappenhall, Thelwall and Higher Walton have been designated
as conservation areas and remain largely unspoiled.
The borough has extensive areas of high-grade agricultural
land, a varied landscape character, and important areas of nature
conservation value, mostly within the relatively narrow gaps
of open land separating Warrington from urban areas to the west,
north and east. Areas of low-lying land within the Mersey flood
plain act as a further constraint to development.
Warrington lies at the hub of the region’s communications
network. The M6, M56 and M62 motorways intersect within the
borough, providing good access to all parts of the region and
beyond. Warrington also lies on the region’s main North-South
(West Coast Main Line) and East-West (Trans-Pennine) rail routes.
Manchester International and Liverpool John Lennon Airports
both lie within easy reach. Two significant waterways sever
the main urban area; the River Mersey, which passes close to
the town centre and, further south, the Manchester Ship Canal.
This role as a crossing point of both river and canal provides
an essential part of the town’s character as well as a
perennial physical planning issue.
5. PLANNING POLICY CONTEXT
In preparing the UDP, due regard has been given to planning
policy guidance at the European, national, regional and sub-regional
levels. This section provides a brief overview of the key considerations
including the need to promote sustainable development, the emerging
European planning agenda, national and regional planning guidance
and the legacy of previous development plans in Warrington.
Sustainable Development
Since the publication of the White Paper ‘This Common
Inheritance’ in 1990, the planning system has been a key
mechanism for the delivery of sustainable development and growth.
Sustainable development is about ensuring a better quality of
life for everyone, now and for future generations. A sustainable
planning framework should:
- provide for commercial and industrial development, food
production, minerals extraction, new homes and other buildings,
while respecting environmental objectives;
- use already developed areas in the most efficient way,
while making them more attractive places in which to live
and work;
- conserve both cultural heritage and natural resources;
and
- shape new development patterns in a way that minimises
the need to travel.
Subsequent government publications have built upon the 1990
White Paper, including ‘Sustainable Development: The UK
Strategy’ (1994) and ‘A Better Quality of Life:
A Strategy for Sustainable Development in the UK’ (1999).
This latest strategy has four main aims:
- social progress which recognises the needs of everyone;
- effective protection of the environment;
- prudent use of natural resources; and
- maintenance of high and stable levels of economic growth
and employment.
Sustainable development is now established as a fundamental
principle within the planning system. Planning Policy Guidance
Notes reflect this as do the more recent guidance in Planning
Policy Statements (PPS), particulary PPS1 ‘Delivering
Sustainable Development’. The way in which individual
PPGs and PPS’s reflect the principles of sustainable development
are covered in the introductory sections of relevant chapters
of the UDP. The UDP has a vital role to play in translating
the themes of sustainable development into land use policies
and proposals at the local level.
The principles of sustainable development have also been taken
forward at the regional and local levels. The government’s
strategy for sustainable development required all English regions
to produce sustainability frameworks by the end of 2000. In
the North West, considerable progress has been made in this
area, with the launch of the region’s Sustainability Framework
and Action Plan, ‘Action for Sustainability’ in
July 2000. The Action Plan contains a set of 27 headline objectives
together with a series of primary and supplementary targets.
At the district level, Warrington’s Local Agenda 21 strategy
‘A Sustainable Development Strategy for Warrington’
was published in March 2000. Its ‘Vision’ restates
the four aims of the national strategy and goes on to set out
eight strategic aims. These include:
- working towards the creation of sustainable communities
(Aim 1);
- minimising waste production and maximising recycling (Aim
5);
- protecting and enhancing local open spaces and biodiversity
(Aim 7); and
- encouraging sustainable economic growth (Aim 8).
‘Key issues’ are identified in respect of each
strategic aim, together with a series of action points and targets.
The UDP is one of the key delivery mechanisms for aspects of
the Local Agenda 21 Strategy that relate to the use and development
of land.
Sustainability Appraisal
Local authorities are expected to carry out a full environmental
appraisal of their development plans to identify the positive,
negative and neutral impacts of policies and proposals upon
the environment. However, the principles of sustainable development
also encompass social and economic, as well as, environmental
issues. The same methodology used for environmental appraisal
can be extended to cover social and economic concerns. With
the intention of placing sustainable development at the heart
of the UDP, the Council carried out a full sustainability appraisal
of the policies and proposals within the UDP. The eighteen indicators
against which each part 2 policy has been assessed are set out
below. A matrix setting out the performance of individual policies
is included at the end of each policy chapter.
Environmental
1. Minimise greenfield use
2. Protect open countryside
3. Protect quality agricultural land
4. Protect natural non-renewable resources
5. Protect urban open space
6. Protect wildlife and biodiversity
Social
7. Ensure housing needs are met
8. Ensure adequate affordable housing
9. Meet local needs locally
10. Promote social inclusion by catering for minority needs
11. Minimise the need to travel, especially by private car
12. Promote public safety and crime reduction
Economic
13. Sustain economic performance
14. Utilise available infrastructure capacity
15. Provide a choice of sites by size and location
16. Ensure a thriving town centre
17. Stimulate urban regeneration
18. Promote efficient movement of people and goods
From July 2004 it became a requirement for local authorities
to ensure relevant plans undergo an environmental assessment
in accordance with EC Directive 2001/42/EC known as ‘strategic
environmental assessment’ (SEA). The Directive applies
to all plans which start formal preparation after 21st July
2004.
The European Planning Agenda
Regional and sub-regional issues are receiving greater prominence
at the European level. This has led to adoption of the European
Spatial Development Perspective (ESDP), the final version of
which was approved in Potsdam in May 1999. The ESDP provides
a framework for spatial planning in Europe which aims to achieve
greater economic and social cohesion; conservation and management
of natural resources and cultural heritage; and a more balanced
competitiveness of the European territory.
The ESDP’s spatial development aims and policy options
seek to achieve:
- the development of a more balanced and polycentric system
of cities within a new urban-rural relationship;
- promotion of integrated transport and communication, including
more equal access to infrastructure and knowledge; and
- development and conservation of the natural and cultural
heritage through sustainable development and prudent management.
The ESDP actively promotes co-operation between and within
member states and between European Community sectoral policies
with significant spatial impacts such as the Common Agricultural
Policy, EU Structural Funds, INTERREG initiatives and Trans-European
Transport Networks.
Although Warrington is not eligible to receive EU Structural
Funds, other European legislation has had, and will continue
to have, implications for Warrington in the future. Examples
of such legislation include the EU Habitats Directive and the
Landfill Directive, which sets targets for the landfill of biodegradable
municipal waste.
The ESDP is a voluntary non-binding agreement. However, it
is intended that authorities and government agencies responsible
for spatial planning at all levels (including local authorities)
should take it into account. The ESDP’s aims and principles
are, perhaps, more applicable at the regional and sub-regional
scales and have been taken into account in Regional Planning
Guidance (now RSS) for the North West. The UDP, in turn, reflects
RPG’s (now RSS) spatial development framework and other
policies guiding the scale and pattern of development within
the region. The UDP also reflects the ESDP as far as it can,
in particular, through its promotion of sustainable development,
conservation of natural and cultural heritage, integrated transport
and by taking a holistic approach towards the borough’s
urban and rural areas.
National Planning Policy Guidance
National guidance, in the form of Planning Policy Guidance
Notes (PPG), Minerals Planning Guidance Notes (MPG) and Circulars,
have provided guidance on general and specific aspects of planning
policy, and in many cases continue to do so. However the implementation
of the Planning and Compulsory Purchase Act 2004, in September
2004, has brought about a number of changes. PPG’s are
now no longer issued and are being replaced by Planning Policy
Statements (PPS). As a new PPS is issued the PPG it replaces
is revoked. A full list of current Government policy is at appendix
1. Local planning authorities must take them into account when
preparing their development plans. Specific aspects of individual
PPGs and PPS’s are referred to where relevant within appropriate
chapters of the UDP.
PPG1 ’General Policy and Principles’ has been the
principal guidance used throughout the preparation of the UDP
and has provided an overview of the Government’s approach
to planning. This is underpinned by the three themes of sustainable
development, mixed use and design. It sets out general principles
of the planning system and the role of development plans within
it. A key role is the provision of homes and buildings, investment
and jobs, in a way that is consistent with the principles of
sustainable development.
PPG1 advises that urban regeneration and the re-use of previously
developed land are important supporting objectives for creating
a more sustainable pattern of development. Mixed-use development
can be more sustainable than single uses, especially in town
centres and other areas highly accessible by means other than
the private car. PPS1 ‘Delivering Sustainable Development’
continues the theme, emphasising the need for sustainable communities
through public engagement with the process.
The planning system thus has to positively promote necessary
development whilst protecting the environment and amenity. The
development plan provides a framework for decision-making that
takes account of, and seeks to balance the environmental, social
and economic aspects of sustainable development. Warrington’s
UDP contributes to sustainable development by providing for
necessary development in the most appropriate locations whilst
protecting valued features of the built and natural environment.
The Planning and Compulsory Purchase Act 2004 came into force
on September 28th 2004. The Act effectively overhauled the planning
system, changing many aspects. From September 2004 Local Authorities
are required to produce a series of Development Plan Documents
(DPDs) which together will form the Local Development Framework
(LDF). The DPDs include a proposals map, site specific allocations
and a core strategy. Other DPDs can include Area Action Plans
and theme or subject related plan documents. The Local Authority
can also produce Supplementary Planning Documents (SPD) to support
policy set out in the DPDs. All of the DPDs are supported by
a Statement of Community Involvement which sets out how the
Local Authority will consult the community on all of the DPDs.
A fundamental change to the system is the inclusion of the Regional
Spatial Strategy (RSS) as part of the statutory development
plan.
Warrington Borough Council has progressed the UDP to adoption
under the transitional arrangements brought in to enable continuity
between the new system and the previous one. These arrangements
provide for the adopted UDP policies to be ‘saved’
for a period of 3 years. During that time however the Council
will be working on progressing the development plan to bring
it in line with the requirements of the 2004 Act. The Council
has published the Local Development Scheme (LDS) which sets
out the approach in more detail.
Regional Planning Guidance for the North West (RPG13)
RPG13 was approved by The Secretary Of State in March 2003.
On implementation of the Planning and Compulsory Purchase Act
in 2004 it became part of the Statutory Development Plan as
a Regional Spatial Strategy (RSS).
The RSS core strategy is to deliver sustainable development
and, in support of this, are four core development principles
of:
- economy in the use of land and buildings;
- enhancing the quality of life;
- quality in new development;
- promoting sustainable economic growth and competitiveness
and social inclusion.
RSS promotes sustainable patterns of growth and change across
the region, but with a much greater focus on regeneration and
urban renaissance in the region’s main towns and cities
(as reflected in its Spatial Development Framework). To this
end, RSS sets out a strategy to secure an urban renaissance
in the cities and towns of the North West; sustain the region’s
smaller rural and coastal communities; and create an accessible
region. It also sets out key principles for development in different
parts of the region of which policy SD2 ‘Other settlements
in the North West Metropolitan Area’ (i.e. outside the
conurbations) and policy SD4 ‘Maintaining Urban Form and
Setting, and the Treatment of North Cheshire’ are most
relevant to Warrington. The Regional Transport Strategy permeates
RSS as a whole. It sets out principles for action by all sectors
and identifies three priorities for transport investment (public
transport infrastructure in major urban areas; key transport
corridors; and gateways and interchanges).
RSS is structured around seven objectives, which cut across
traditional planning issues. They are:
- to achieve greater economic competitiveness and growth,
with associated social progress;
- to secure an urban renaissance in the cities and towns
of the North West;
- to ensure the sensitive and integrated development and
management of the coastal zone, and secure the revival of
coastal resort towns;
- to sustain and revive the Region's rural communities and
the rural economy;
- to ensure active management of the Region's environmental
and cultural assets;
- to secure a better image for the Region and high environmental
and design quality; and
- to create an accessible Region, with an efficient and fully
integrated transport system.
RSS policies support these broad objectives. Subsequent chapters
of the UDP explain in greater detail how the RSS core strategy,
spatial development framework and specific policies have been
taken into account in preparing the UDP.
The RSS has become part of the statutory development plan of
each local authority within the region. At the time of adoption
of the UDP, a review of RSS has commenced. Changes made when
the review process has been completed will need to be taken
into account in Warrington’s local development framework,
as the Council moves towards developing a Core Strategy and
other DPDs in accordance with the requirements of the 2004 Act.
Planning Policies in Cheshire
Cheshire County Structure Plan
Because Warrington became a unitary authority prior to the
adoption of Cheshire 2011, the earlier Cheshire 2001 Replacement
Structure Plan (‘Cheshire 2001’), approved in 1992,
still formed part of the approved development plan for the borough.
Certain of its policies were time-limited (e.g. those setting
out the number of new dwellings and amount of employment land
to be provided by April 2001) whilst others have endured until
sufficient weight can be attached to the UDP. The adopted UDP
has however now superseded the Cheshire 2001 Structure Plan.
Cheshire Minerals & Waste Plans
When Warrington became a unitary authority it assumed responsibility
for minerals and waste planning matters within the borough,
functions previously carried out by Cheshire County Council.
These were adopted in 1987 and also remained in force in Warrington
until superseded by the adopted UDP.
Local Plans in Warrington
The Deposit Draft version of the Warrington Borough Local Plan
was published in 1994. At that time, it gave the Council its
first opportunity to address borough-wide planning issues through
the statutory planning system. Objections to the plan were considered
at a long-running public local inquiry in 1996/97. However,
the Council became a unitary authority prior to receiving the
Inspector’s report in September 1998. As a consequence,
work on that plan was discontinued in June 1999.
The draft local plan had recognised that opportunities for
further growth within the town of Warrington were limited. It
therefore sought to safeguard land on the edges of the town
and the borough’s larger villages for longer-term development
needs whilst, simultaneously, defining defensible green belt
boundaries. When work on the draft local plan was discontinued,
the definition of green belt boundaries, the related issue of
Areas of Search and the safeguarding of routes for future highways
schemes, were left to be resolved through the UDP process. The
UDP now addresses these issues within the context of sustainable
development and the need to maximise the proportion of new development
on brownfield land.
Although progress on the local plan was discontinued in 1999,
many of its more detailed policies for guiding development control
decisions in the borough were incorporated into a ‘Consolidated
Policy Schedule’. This was informally adopted by the Council
and used for development control purposes prior to publication
of First Deposit Draft UDP.
A number of other local plans and town maps were still operative
in the borough although, in practice, they were of limited relevance
due to their age (see list below). These have been replaced
by the adopted UDP.
| Padgate and Penketh Town Map (with amendments) |
1956 |
| Stockton Heath Town Map |
1958 |
| Warrington Town Map (with amendments) |
1959 |
| Rixton Brickworks Subject Plan |
1980 |
| Town Centre Local Plan |
1982 |
| Stretton Airfield Local Plan |
1982 |
| Walton Park Subject Plan |
1982 |
| Old Howley Local Plan |
1984 |
| Orford South Local Plan |
1984 |
| Whitecross/Arpley Meadows Local Plan |
1986 |
The UDP has also replaced certain policies in the Merseyside
and Greater Manchester Structure Plans (adopted in 1980 and
1986 respectively) and Green Belt Local Plans (1983 and 1984)
insofar as they affected land transferred from those areas into
Warrington following local government boundary reviews in 1993
and 1994.
The UDP has also superseded the Warrington New Town Outline
Plan, approved in 1973 to guide the town’s expansion during
the new town era.
Links to other Council Plans and Strategies
Warrington’s Corporate Plan sets out a vision for the
borough and identifies priorities for action to guide the Council
and other agencies in planning and delivering their services.
The UDP is one of the most important delivery mechanisms for
those corporate priorities and objectives relating to the use
and development of land. Whilst the UDP has links with several
corporate priorities, it is particularly relevant to those on
regeneration, economic prosperity and the environment.
The UDP also has links with various other Council plans and
strategies. By providing the statutory basis for decisions about
the future use and development of land for housing, employment,
retailing, leisure and other uses, the UDP has clear links with
the Council’s Housing, Economic, Leisure and Town Centre
strategies. The UDP’s policies and proposals for transport
support and will help to deliver elements of the Local Transport
Plan (LTP). These, and other policies for minerals, waste and
the protection and enhancement of the environment will all help
to deliver Warrington’s LA21 Strategy.
6. IMPLEMENTATION AND RESOURCES
The Council does not have the powers or the resources to implement
the UDP by itself. One of the UDP’s primary functions
is to provide a degree of certainty in the planning framework
and a context within which other organisations, businesses and
developers can make decisions about their future investments
within the borough. The UDP does this in two ways. Firstly,
the UDP has proposals for specific actions ‘on the ground’,
most notably on sites allocated for new housing, employment,
retail or other uses. The successful development of these sites
will largely depend on the actions of other agencies and organisations.
The private sector is expected to continue to be the major provider
of new houses, employment opportunities, etc. over the lifetime
of the plan. The implementation of many other UDP objectives
(e.g. bringing derelict and vacant land and buildings back into
beneficial use, the provision of new and better health, recreation
and community facilities, public transport improvements to name
but a few) are all reliant on the efforts of other agencies.
These might be from the private, public and voluntary sectors,
perhaps working in partnership with the Council or, in some
cases, with each other. The Council intends to prepare development
briefs for the most important or problematical of sites allocated
in the UDP to provide developers with further guidance on how
it expects, or would like to see them developed.
The Council will take account of the UDP when co-ordinating
and prioritising its own spending programmes and when making
decisions about its own land and property holdings. It may also
be used to underpin bids (either by the Council or other agencies
involved) to secure grants or other forms of funding where these
are needed to enable the successful implementation of UDP proposals.
The Council will also use the UDP, where appropriate, to lobby
and influence other agencies to invest their resources in Warrington.
As well as allocating sites, the UDP’s more general policies
provide certainty as to the types of development that will and
will not be acceptable in different parts of the borough. These
normally set out criteria against which the Council can judge
what is and is not acceptable and measure the quality of development
proposals. Such policies provide guidance to developers by clearly
setting out the Council’s requirements and expectations.
The Council will use these policies to guide its decisions on
planning applications. Where necessary, expert advice will be
sought from other Council departments (for example, on matters
such as traffic, noise and contamination), statutory undertakers
and other external agencies such as those responsible for heritage
and conservation matters. In granting planning permission, the
Council may attach planning conditions or obligations to secure
the provision of facilities or other improvements needed in
connection with the proposed development. This might, for example,
include the provision of open space, play equipment, affordable
housing or highways improvements.
Further guidance relating to particular types of development
is available for developers in the form of Supplementary Planning
Guidance (SPG). A schedule of current SPG is attached at appendix
4. The Planning and Compulsory Purchase Act 2004 introduced
a new approach involving Supplementary Planning Documents (SPD)
that will be development plan documents within the Local Development
Framework. Any new SPDs will be prepared with full consultation
in accordance with the Council’s Statement of Community
Involvement. Where it is clear that a new SPD will be required
to support a UDP policy or group of policies, this is referred
to in the explanatory text to the policy or policies in question.
7. MONITORING AND REVIEW
Local planning authorities are required to monitor the effectiveness
of their development plans. Monitoring is the process by which
the Council ‘tests’ the performance of the plan
and ascertains whether it is achieving its stated aims and objectives.
Ultimately, monitoring provides the basis for future plan reviews.
Specific performance indicators for key policies, which will
be the subject of future monitoring reports, are listed at the
end of the relevant policy chapter.
Some aspects of the plan will be easier to monitor than others.
The Council’s development control and building control
processes will, for example, be used to monitor progress on
sites allocated in the plan as and when they are granted planning
permission and developed. Other policies lend themselves to
monitoring because they are expressed in quantitative terms.
Many of the housing policies, which need to be monitored in
accordance with the provisions of PPG3, fall into this category.
These include the number, tenure, size and type of new dwellings
built during the plan period; the number of affordable dwellings
provided; the proportion of dwellings on brownfield sites or
provided through the conversion of existing buildings; housing
densities; parking and open space provision in new housing developments.
The Council will also need to monitor the take-up of land for
employment uses and, in accordance with PPS6, monitor the vitality
and viability of Warrington town centre and smaller district
centres within the borough. Key environmental assets and features
of the natural and built environment will also need to be monitored,
including, for example, the protection of open spaces, ponds,
hedgerows and listed buildings.
The UDP’s policies have, wherever possible, been expressed
in a form that allows them to be monitored. Some incorporate
specific targets. However, some policies deal with more qualitative
issues and are, consequently, more difficult to measure. Examples
include the standards of design in new developments, the extent
to which the UDP can contribute towards reductions in crime
and improvements in air quality.
All of these issues will be monitored on a regular basis. The
Council will publish the results of this monitoring work at
regular intervals. The aim would be to monitor key developments,
i.e. decisions on major planning applications, at 6 monthly
intervals with annual reports on a broader range of policy issues.
This will build upon existing monitoring work already carried
out by the Council such as its annual reports on housing and
employment land. As well as monitoring the effectiveness of
specific policies within the UDP, the Council has a general
duty to monitor demographic, economic, social and environmental
changes within the borough.
The results of this monitoring work will be taken into account
in future reviews of the Development Plan.
8. STRATEGIC AIMS, POLICY OBJECTIVES AND PRINCIPLES
The UDP is one of a family of corporate strategies through
which the Council’s strategic objectives are delivered.
The Corporate Plan builds on five themes set out in the Community
Strategy:
- Community Safety
- Transportation
- Health and Wellbeing
- Environment Regeneration and Housing
- Learning, Skills and Inward Investment
Each of the themes are translated into strategic objectives,
which are further split into improvement priorities and key
tasks. Although no explicit reference is made to the Council’s
corporate priorities and objectives in the body of the UDP in
relation to individual policies, they have been taken into account
in the preparation of the Plan, and implementation of the Plan
will contribute to their achievement. This inter-relationship
between the broader aims of the Council, its land-use policiies,
and the community is an area to be explored more fully under
the new planning system.
9. PRINCIPLES GUIDING THE UDP'S PART 1 POLICIES
Drawing upon all of the contextual factors set out, and having
particular regard to the UDP’s role as a delivery mechanism
for the Council’s corporate priorities and strategic objectives
the following principles have guided formulation of the part
1 policies.
DEVELOPMENT CONTROL STRATEGY
- To ensure that new development is approved only where harm
to the amenity of local residents, the conservation of recognised
built and natural environmental assets and of the environment
of the surrounding area is avoided, and that land is used
efficiently and does not undermine the achievement of sustainable
patterns of development.
- To ensure that, where reasonable and necessary for the
granting of permission for development, ‘planning obligations’
for provision of, or contributions towards provision or upgrading
of engineering services and/or for social, community and recreational
facilities are secured through negotiation with developers
and that this process is applied rigorously, comprehensively,
consistently and openly.
- To ensure that the highest achievable standard of urban
and architectural design is secured in all development, including
that relating to public spaces and transport infrastructure.
HOUSING
- To ensure that sufficient land for housing, including conversions
of existing buildings, will be provided to accommodate the
strategic housing requirement for Warrington as set by the
Regional Spatial Strategy for the North West, for the period
to 2016.
- To maximise the proportion of housing from previously-developed
land (including conversions of existing buildings).
- To ensure that in larger housing developments, as defined
in policy HOU15, every opportunity to provide affordable homes
is investigated and secured through negotiations with developers.
EMPLOYMENT
- To ensure that provision is made for sufficient land for
business, general industrial and storage/distribution uses
during the period up to 2016, in addition to the Regional
Employment site at Omega.
- To ensure, in particular, that established businesses,
located within communities can continue to operate in an environment
and with the infrastructure required to enable them to thrive.
- To facilitate the successful development of the Omega Regional
Employment site, with the major part of the site being made
available to meet the needs of employment developments within
the priority sectors identified within the NWDA’s Regional
Economic Strategy.
ENVIRONMENTAL PROTECTION AND ENHANCEMENT
- To establish firm green belt boundaries around Warrington
town and the borough’s larger villages that will be
capable of remaining unaltered for as far as can be seen ahead,
taking account of the potential land supply to meet continuing
development needs beyond 2016 and within the intended life
of the green belt.
- To guide new development primarily to sites within the
existing built-up areas of the borough, protecting the open
countryside (green belt) and green spaces within the urban
areas, whilst seeking to maintain the setting, form and character
of settlements.
- To promote and encourage the reclamation of derelict and
despoiled land and buildings for beneficial uses.
RESOURCE CONSERVATION
- To ensure that prudent use is made of land, environmental
and energy resources.
- To protect the best and most versatile agricultural land
from development, unless there is an overriding need for development,
and there is no suitable alternative site for the proposed
development.
- To manage the risks of climate change.
TRANSPORT INTEGRATION
- To pursue the establishment of safe, sustainable and integrated
patterns of transport and movement in the borough, linked
to existing and future land-uses in the most resource-efficient
and sustainable manner, in particular, to contribute to desired
reductions in the overall need to travel and to facilitate
trips by the most environment-friendly modes of transport.
TOWN CENTRES AND RETAIL DEVELOPMENT
- To ensure, as far as possible, that provision for retailing
in the borough safeguards and enhances the vitality and viability
of centres, according to the following hierarchy:
- Warrington Town Centre
- The District Centres, of Birchwood, Stockton Heath,
and Westbrook
- Neighbourhood, and Local Centres
- To promote the retail core of Warrington town centre, as
the primary focus shopping in the borough and for a sub-regional
area extending beyond the borough’s boundaries.
- To facilitate retail development in District, Neighbourhood,
and Local Centres, where it is of a scale and type appropriate
to the area served by the centre and consistent with the nature
and function of the centre which it is intended it should
support and enhance.
- To allow retail development on the edge of the retail cores
of the centres in the hierarchy, only where there is a demonstrable
need for the development and no suitable site can be found
within the centres themselves.
- To permit out-of-centre retail development, only where
there is a need which cannot be met in, or on the edge of,
the Town Centre, District, Neighbourhood, Local and Village
Centres, or where (by reason of its scale or character and
the bulky nature of the goods to be sold) it would be inappropriate
to site the development within the retail hierarchy.
- To employ the development control process to facilitate
development of Warrington town centre’s role as the
principal focus of a range of uses other than retail, including
cultural, community, leisure, entertainment, commercial and
business development.
SOCIAL PROGRESS
To ensure, as far as possible, that new development is located
and designed such that it provides a safe environment and contributes
practically to greater social inclusiveness by being accessible
to all sectors of the community, especially those with impaired
mobility or without access to private transport.
MINERALS AND WASTE
- To ensure that the principles of sustainable waste management
are central to the consideration of all development proposals
for waste management facilities in accordance with European
Directives and the National Waste Strategy. In determining
proposals for waste related developments, regard will be given
to the Best Practicable Environmental Option for the waste
stream, including regional self-sufficiency, the proximity
principle, the waste hierarchy, and sustainable transportation
- To ensure that waste management facilities are allowed
only where a demonstrable, proven need exists for the development
- To ensure that minerals and waste developments are approved
only where environmental quality and resources can be safeguarded
and that planning applications are supported by all necessary
information.
- To approve proposals for primary aggregate extraction only
where there is a demonstrable need for the aggregate and where
the aggregate cannot be met from secondary or recycled sources.
To summarise:
Through its policies and proposals and the measures through
which they will be implemented, the UDP seeks to play a key
role in promoting and bringing about the development of ‘sustainable
communities through regeneration’. This is a long-term
challenge and the UDP’s policies are designed to provide
a transparent and assured framework for action, guidance and
control in the period up to 2016, but with implications for
the even longer-term. However, it is not a ‘blueprint’:
it is not prescriptive as to what should or should not take
place on every plot of land in the borough. Rather, it provides
a flexible framework within which development issues can be
considered as they arise.