Scheme Overview
Roadworks sign

-

09:30 - 15:30
Scheme Detail

Works are currently underway to install safety barriers and highway bridge parapets at Longford Bridge, from Monday 7 September, for up to 10 weeks.

Due to the difficult nature of the works, it will be necessary to intermittently close a lane along Winwick Road, between 9.30am and 3.30pm.

Lane closures will only be in place within these times for short periods for deliveries, and for some of the works to be carried out. All lanes will be open to traffic outside these times.

Variable message signs in the area will be activated in advance to warn of the intermittent lane closures, when this needed for the above activities.

Pedestrian/cycle access will be diverted via the nearby crossing points and vehicular access will be under the control of the Principal Contractor.

Bus services will not be affected by the works.

The Principal Contractor for this scheme is Tarmac Trading Ltd.